Login Pop-up

+971 2 599 4200

Glass Processing

glass

Our quality
We provide high performance Green Building Facades for sustainability and environmental compliance. The relentless increase of CO2 emissions, particularly in the Gulf region is signaling and alarm for architects to emphasize on climate-responsive buildings.(High performance green Buildings, HPGB). It generates the need to incorporate facades and the right selection of glazing to produce low-energy architecture. We employ the world renowned LEED® system where projects earn LEED® points for satisfying specific Green building criteria.

Process Flow
The glass process flow consists of elaborate and intricate systems in glass processing which include cutting, refining edges and polishing glass. Glass is also insulates, laminates and tempered according to the client’s requirements. We employ the best machinery and the most experienced personnel to undertake the responsibility of providing optimum results and efficiency. We ensure Quality Control, at every stage. Process operators are responsible to check and comply with the specified inspection criteria and verified by the QC Engineer.

Our reputed products include

           •    REG Heat Treated Glass
           •    REG Fully tempered Glass (FT)
           •    REG Heat Strengthened Glass (HS)
           •    REG Insulated Glass Units
           •    REG Laminated Glass

 

2017 ACHIEVEMENTS

As another year comes to an end, we would like to take this opportunity to wish you all a Rewarding, Joyous New Year upon you and your loved ones. Since 2017 have been successful year for REA, it’s worth to highlight some of 2017 accomplishments;

Projects Handover

  • 2000 Villas
  • Akoya Villas
  • 3000 Villas
  • C15 – Reem Island
  • Viceroy Hotel
  • Serenia Residence
  •  MBS Crowne Plaza

Projects Awarded

- Masdar Neighborhood Institute

Projects Progress

  • 98.0% on W- Hotel.
  • 93.0% on Axis Tower.
  • 70.0% on Seventh Heaven.
  • 67.0% on Nad Al-Sheba
  • 58.0% on Ashjar.
  • 43.0% on Suit In The Skai Tower 1.
  • 43.0% on The Palm Tower.
  • 36.0% on Tiara United Tower.
  • 15.0% on Vida Residences.
  • 7.0% on Opera Grand.

Events

  • REA launches AIM (All Ideas Matter) employees suggestion scheme.
  • Tiara towers performance Mock Up test passed from first attempt at Exova testing lab in Dubai.
  • successful 2 years of REA in Bangalore, participating in Design of landmark projects in Dubai.
  • Sharjah University visit Reem Emirates Aluminum.
  • Reaching last floors installation of REA's Unitized Curtain Wall on MBS Crown Plaza project, Manchester City, UK.
  • The Palm tower performance Mock Up test passed from first attempt at Exova testing lab in Dubai.
  • Successful Civil Defense Drill in Reem Emirates Aluminum Factory.
  • REA is pleased to recognize the dedicated workers for their high performance and commitment.
  • Final Completion at Serenia Residences Project on Jumeirah Palm Dubai.
  • Strong presence for Reem Emirates Aluminum and Hansen Facades at Zak World of Facades UK 2017.
  • 19 Duncan Street performance Mock Up test passed at Exova testing lab in Dubai.
  •  Reem Emirates Aluminum employees were honored to visit Wahat Al Karama (Oasis of Dignity).
  • Open panel discussion about Artificial Intelligence in Future Cities and Smart Manufacturing delivered by Eng. Naser Almarzooqi, Reem Emirates Aluminum GM at GITEX 2017 Dubai.
  • VIDA tower performance Mock Up test passed at Exova testing lab in Dubai.

We thrived because of your incredible hard work, creativity, and dedication. I am personally grateful to each one of you for your tremendous efforts. Through your commitments and efforts, REA has been capable of sustaining its position in the market as a leading Façade Company in UAE, with high and robust potentials in global markets. We will continue to provide high-quality façade solutions achieving clients’ retention and satiation.

Every day, your support makes REA’s growth possible and I look forward to a successful, positive and productive year.
Thank you for your efforts in 2017 and welcome 2018 with its challenges.

CONTACT
Scroll to top